Y-1 Semiconductor Cluster_West Integrated Utility Tunnel Project, Yongin-si, Gyeonggi-do, South Korea

  • Statinio tipas:
  • Infrastruktūra
Per visą ekraną Užverti

SK hynix, a global leader in semiconductor manufacturing, is currently developing a large-scale semiconductor cluster in Yongin, Gyeonggi Province. During the first phase of this project, Peikko’s COPRA® Anchoring Coupler bolts were successfully applied to a section (approximately 1.2 km) of the West Integrated Utility Tunnel.

To accommodate future structural expansion, COPRA® Anchoring Coupler bolts were pre-installed in the lower structure during Phase 1. After completion of this phase, the structure was backfilled with soil. In the upcoming Phase 2, scheduled to take place several years later, the soil will be removed, and the upper structure will be connected to the pre-installed anchor bolts, enabling seamless extension of the utility tunnel.

Given the long-term underground installation, the coupler part was hot-dip galvanized (HDG) for corrosion protection. The interior was filled with vaseline grease and sealed with NPP caps to further prevent rust and ensure long-term durability.

This project is a result of close collaboration with the client, involving multiple rounds of technical discussions and product selection. It stands as a representative case demonstrating how COPRA® Anchoring Coupler bolts can effectively support long-term structural expansion in underground applications.

Plačiau down-arrow.png

Projekto duomenys

Plotas:
1.2km m2
Vystytojas:
SK hynix
Rangovas:
SK ecoplant
Architektūrinė dalis:
SK ecoplant
Projektavimo darbų pradžia:
2025
Užbaigimo metai:
2025

Panaudoti mūsų sprendimai

Susisiekite su mumis