Harbaksfjellet wind farm, Åfjord, Norway

  • Statinio tipas:
  • Energetinė statyba
Per visą ekraną Užverti

Harbaksfjellet wind farm is part of the Fosen Vind project, Europe’s largest onshore wind project. 

The wind farm is located in Åfjord,Trøndelag county and consists of 30 turbines in total. Each turbine has a capacity of 4.2 MW, which gives a total installed capacity of 180.6 MW. Planned annual production is 548GWh. Construction of the wind farm began in 2018 and completed in 2020.

Fosen Vind DA, the developer of Harbaksfjellet wind park, is a joint venture between the Norwegian TrønderEnergi and Statkraft, and Nordic Wind Power DA, formed by an European investor consortium of Credit Suisse Energy Infrastructure Partners and Swiss BKW AG. 

The heavy machinery contractor, Johs J. Syltern, were the prime contractor for civil work and infrastructure. Consisting of establishment of internal roads, hardstands, and preparation of the turbine spots. Their sub-contractor, Stjern Entreprenør, performed the technical assembly of steel components and foundation casting work.

Tensioning of FATBAR® rock anchors was performed by the sub-contractor, Hytorc Norge AS. Peikko Group’s Norwegian Sales Office Peikko Norge AS arranged the delivery of rock foundation technology.

Peikko was responsible for foundation design and the structural calculations for 30 wind turbine foundations, combined with manufacturing, and supply of customized steel components, such as:

  • FATBAR® rock anchors
  • Tower adapter plates with tower connection bolts
  • Drilling templates- and assembly system
  • Advanced reinforcement steel technology.

These wind farms are located in the Fosen peninsula, the central part of Norway. The coastal area has some of the best conditions for wind power production in all of Europe. All six wind farms together produce a total of 3.6 TWh of renewable energy every year. The Fosen project is larger than the total current wind power capacity in Norway.

Plačiau down-arrow.png

Peikko has met all our expectations when supplying the components to the previous wind parks of Fosen Vind, and furthermore they have provided a competitive solution for these new wind parks

Svein Ole Daltveit, responsible for cost calculations at Johs. J. Syltern.

Projekto duomenys

Vystytojas:
Fosen Vind DA
Rangovas:
Johs J. Syltern AS
Projektavimo darbų pradžia:
2019
Užbaigimo metai:
2020
Jėgainių kiekis:
30
Jėgainės gamintojas:
Vestas
Jėgainės galia, MW:
V117-4.2 MW
Aukštis, m:
87 m

Susisiekite su mumis