Community Facility of Jamsil Jinju Apartment, Songpa-gu, Seoul, South Korea

  • Statinio tipas:
  • Prekybos pastatai
Per visą ekraną Užverti

This project applied a dry joint system to the stair core of the community facility within the apartment complex.

The construction-stage analysis was divided into three phases: after core element installation and before grout curing, after grout curing, and finally the stage where the core interacts with the main structural system. The construction was completed quickly and safely.

Projekto duomenys

Vystytojas:
Samsung C&T Corporation
Rangovas:
Samsung C&T Corporation
Konstrukcinė dalis:
RISE STRUCTURAL ENGINEERING
Architektūrinė dalis:
TAEHWA ENGINEERING CO., LTD (SHOP DESIGN)
Surenkamojo g/b gamintojas:
KC INDUSTRY
Projektavimo darbų pradžia:
2023
Užbaigimo metai:
2023